GAS:

According TO for gasification № 2943-33/19 dated 01.10.2008 (the total capacity of 1.26 MW) source of gas supply: pipeline pressure P = 1.2 MPa, D = 400 mm, laid near JSC "Schelkovskoye mine".

ELECTRICITY:

Concluded an agreement with "МОЭСКО" and received permission to technological accession power 920 kW.

Prepared and coordinated land use documentation on temporary land acquisition for laying electric cable route length of 3,5 km from the ER to the site.

PLAN ROUTE EXTERNAL POWER SUPPLY NETWORKS:
Plan route external power supply networks

RAIL DRIVEWAYS:

500 meters to the existing access road owned Schelkovskoye mine.

ACCESS ROADS:

Paved road to the border area.

DRAIN:

Design your local sewerage type "ТОПОЛЭКО"

WATER:

Drilled their own wells. We obtain a license for subsoil use.

FEASIBILITY INDICATORS:
№ i/o Name of indicators Unit Indicators
1 2 3 4
Performance Master Plan
1 Land area within the land allotment ha. 4,8106
2 Building area sq.m. 17 862
3 Area landscaping sq.m. 10 512
4 Area coverage sq.m. 19 732
Space-planning figures for the main production facilities
5 Building volume cbm. 252 369,5
6 Building area sq.m. 17 800
7 Total area sq.m. 17 371,5
Process indicators
8 Capacity of warehouse complex pallet places 27 000
9 The number of working days per year day 290
10 Number of shifts shift 2
11 Duration of shift hour 8
12 Number of employees - all pers. 119
including:
production department pers. 35
Warehouse complex pers. 84
Performance indicators
13 Consumption of water (private wells, the license is obtained) cbm./day 12,66
including:
On drinking needs cbm./day 11,65
On production needs cbm./day 1,01
14 Number of sewage cbm./day 11,65
including:
Household cbm./day 11,65
15 Consumption of thermal energy Tues 962 390
16 Annual consumption of electricity Т.kW/hour 1630,0
17 Consumption (theoretical) capacity of electricity kW 409,0